Know the cost before you commit

Estimation & BOQ

Know the cost before you commit

Quantities taken off your own drawings and priced line by line — so the budget is a decision you make at the start, not a surprise halfway through.

What we measure

Every item, taken off the drawing

A rate per square foot is a starting point, not an estimate. A real estimate counts what the building actually needs.

Quantity Take-off

Volumes and areas measured off the final drawings — excavation, concrete, masonry, plaster, flooring and finishes.

Cement Estimation

Bag counts worked out grade by grade for footings, columns, beams, slab, masonry and plaster.

Sand Estimation

Fine aggregate quantified separately for concrete, masonry mortar and plaster, in cubic feet.

Aggregate Estimation

Stone chips quantified by grade for each concrete element, with wastage allowed for.

Steel Estimation

Reinforcement weighed from the bar bending schedule, diameter by diameter, not guessed per square foot.

Brick Estimation

Brick or block numbers counted from the actual wall areas and thicknesses on the plan.

Labour Estimation

Mason, bar bender, carpenter, electrician and plumber effort costed by stage.

Complete BOQ

Every item with quantity, unit, rate and amount — the document you approve before work starts.

Approximate Project Cost

An early budget figure while the design is still being decided, so you can plan finances.

Budget tool

What will it cost to build?

Enter your plot size, floors and the quality you have in mind. The estimate uses current Patna market rates, real material quantities and your plot's boundary — the same way we start every estimate.

Your project

Leave blank and we will work it out from your plot size.

Construction type
Quality level

Also include

Approximate estimate

Fill in your plot details and press Calculate Estimate.
Your figures appear here.

The difference

Calculator vs. detailed estimate

The calculator above

Uses standard rates and industry thumb-rules against your plot size and quality level. Useful for planning your finances and comparing options. It is an approximate estimate, not a quotation.

A detailed BOQ from us

Prepared after a site visit and against your final drawings. Accounts for soil and foundation type, structural design, your actual material selections and current market rates — and becomes the basis of the contract.

Ready when you are

Want the real number for your plot?

Send us your drawings, or let us prepare them. Either way you will get a BOQ you can check line by line.